500ml Juice Beverages Glass Water Bottle with Bamboo/Stainless Steel Lid & Sleeve 750ml 1L 300ml 14oz

Still deciding? Get samples of $ !
Order Sample

Product Description

Basic Info & Overview
Model NO.
SLD
Insulation Type
Uninsulated
Lid Type
Screw-on Lid
Material
Glass
MOQ
5000PCS
Lead Time
10days
Logo
Acceptable
Feature
Recyclable
Color
Transparent
Sealing Type
Screw Cap
Package Size
35.00cm * 30.00cm * 20.00cm
Gross Weight
1.000kg
Product Description

500ml Juice Beverages Glass Water Bottle with Bamboo/Stainless Steel lid & Sleeve 750ml 1L 300ml 14oz

ItemGlass Bottle, Glass beverage bottle, water bottle, juice bottle, milk bottle, coffee bottle, glass packing
MaterialSoda-Lime Glass
Capstainless steel/aluminum/bamboo screw cap or customized
Capacity150ml 300ml 420ml 500ml 600ml 750ml 1000ml
Bottle ColorClear, frosted or painting any color according to your requirements
CraftworkSilk screen printing, decal decoration, color spray-painting, frosting, hot stamping, labelling etc.
SampleFree samples are available
Payment terms30% -50% as deposit, balance before shipment
Detailed Photos
Company Profile

Our company is a professional provider of glass, plastic and other packaging products with integrated capacity of design, processing, production, and innovation. We work closely with our customers to provide tailor-made packaging solutions. Featured products include: Glass Beverage Bottles, Glass Jars, Glass Spice Bottles, Cosmetic Bottles, Glass Tableware, and more.

Production Process
Production & Workshop
Production Line
Workshop
Packaging & Shipping
Our Advantages
Frequently Asked Questions
Q: Can I get free samples?
A: Yes. We would like to send several samples for your reference if you could afford freight.
Q: What surface handling could you support?
A: We could supply screen printing, spraying, hot stamping, frost, label printing etc.
Q: Do you accept customized order?
A: YES. We can arrange opening the mould according to customers' requirement.
Q: What is the normal lead time?
A: For stock products, 5-10 days. For mass production, around 35 days, or longer if surface handling is required.
Q: How do you control the quality?
A: We do 3 times leakage tests before packing, and our QC team controls the entire process.
Q: What are your preferred trade terms?
A: We can accept FOB, C&F, CIF, etc.

Related Products